Our Projects
01. Ministry of Defence – Al Majma'ah Road Telecom Infrastructure
Al Majma'ah, Saudi Arabia
Objective: Development and implementation of advanced telecom infrastructure to support seamless communication for the Ministry of Defence.
Accomplishments
- Designed and deployed a robust telecom infrastructure system,
ensuring high-speed and reliable connectivity along Al
Majma’ah Road. - Successfully integrated state-of-the-art technology to support
secure and uninterrupted communication for strategic
operations. - Overcame logistical challenges to complete the project within
the stipulated timeframe and budget. - Ensured compliance with regulatory and defense-specific
standards for infrastructure security and performance.
Key Metrics/Results
- Achieved 99.9% network uptime post-implementation.
- Enhanced communication efficiency for defense operations in the region.
- Completed project delivery 10% ahead of schedule while maintaining quality benchmarks.
02. SPARK (Aramco Dry Port) Telecom Infrastructure
Accomplishments
- Successfully designed and installed a state-of-the-art telecom infrastructure to support seamless operations at SPARK Dry Port.
- Integrated high-speed, secure connectivity solutions tailored to the port’s complex logistical and operational requirements.
- Completed the project on schedule while ensuring compliance with Aramco’s rigorous safety and quality standards.
- Enabled robust communication channels for enhanced operational coordination and efficiency.
Key Metrics/Results
- Achieved 100% coverage across the port area with zero downtime during the initial rollout.
- Reduced communication lag by 40%, streamlining logistical processes.
- Delivered the project 15% under budget without compromising on quality.
03. Relocation of STC & Mobily Networks – Dhurma Road with Qiddiyah
Accomplishments
- Successfully relocated and restructured STC and Mobily telecom networks along Dhurma Road to accommodate Qiddiyah’s infrastructure development.
- Maintained uninterrupted services during the transition to minimize disruption for end-users.
- Coordinated seamlessly with stakeholders to ensure compliance with technical and regulatory requirements.
- Upgraded network infrastructure to enhance performance and future scalability
Key Metrics/Results
- Relocation completed 20% ahead of schedule.
- Achieved 100% network availability during the transition phase.
- Improved network capacity by 25% to support Qiddiyah’s future expansion needs.
04. Qiddiyah Tunnel Security and Communication Systems
Accomplishments
- Installed an advanced security system, including access controls and high-resolution CCTV, ensuring comprehensive monitoring and safety within the tunnel.
- Successfully implemented a state-of-the-art radio communication system for seamless coordination and real-time connectivity.
- Deployed a robust SCADA system for centralized control and monitoring of tunnel operations, enhancing operational efficiency and safety.
- Delivered an integrated solution meeting stringent safety and technical standards for critical infrastructure.
Key Metrics/Results
- Achieved 100% coverage with CCTV and radio systems across the tunnel.
- Improved incident response time by 30% through integrated access and monitoring systems.
- Ensured 24/7 operational reliability with the SCADA system, reducing downtime risks to near zero.
- Project delivered on time with full regulatory compliance.
05. Qiddiyah – Taif Road Telecommunication Infrastructure & Solar Street Lighting
Accomplishments
- Designed and installed a cutting-edge telecommunication infrastructure, ensuring high-speed connectivity along the Qiddiyah-Taif Road.
- Deployed eco-friendly solar street lighting, enhancing roadway safety while promoting sustainability.
- Successfully integrated telecom and lighting systems with minimal disruption to existing road operations.
- Met project milestones ahead of schedule with strict adherence to environmental and technical standards.
Key Metrics/Results
- Achieved 100% telecom coverage and uninterrupted connectivity across the road stretch.
- Reduced energy consumption by 40% through solar lighting solutions, contributing to sustainability goals.
- Delivered the project 10% under budget, maintaining high-quality standards.
- Enhanced roadway visibility and safety, reducing night-time accidents by an estimated 20%.
06. Dynamic High-Speed WIM Stations
Successfully implemented in 3 locations:
- Al-Hasi
- Redwan
- Abu Hadria
07. Pre-Selection Dynamic WIM Stations with MOT
Deployed across 21 locations, ensuring optimal vehicle pre-screening and compliance before entering regulated zones.
Designed to support the Ministry of Transport’s (MOT) initiatives for enhanced road safety and infrastructure protection
08. Low-Speed Static WIM Stations
Refurbished and upgraded 102 low-speed enforcement stations in collaboration with Tahakom, delivering state-of the-art Weigh-In-Motion (WIM) systems to detect overloaded heavy goods vehicles, monitor dimensions, load distribution, axle spacing, and ensure vehicle safety compliance. The project also included advanced data collection capabilities and integrated back-office enforcement solutions to streamline regulatory compliance and operational efficiency.